State ex rel Stovall v. Reliance Insurance Co.1/21/2005
Affirmed in part, reversed in part, and remanded with directions.
This litigation arises from the failure of the underground thermal piping system for heating and cooling at the El Dorado Correction Facility (EDCF). The State sued various entities believed responsible for the defective construction, including George M. Myers, Inc., d/b/a GMM, Inc. (GMM), Professional Mechanical Contractors, Inc. (PMC), Dean E. Norris, Inc. (DEN), and American Thermal Products, Inc. (ATP). The district court entered final orders which fixed the amount of the State's potential recovery against GMM and its surety, Reliance Insurance Company (Reliance), and dismissed the State's third-party beneficiary claims against PMC, DEN, and ATP. The State's applications for interlocutory appeal and notices of appeal were timely filed, and the appeal was granted. The appeal is before this court pursuant to a K.S.A. 20-3018(c) transfer. We filed our original opinion in this case on June 18, 2004 (State ex rel. Stovall v. Reliance Ins. Co., 278 Kan. 3, 91 P.3d 531). On July 8, 2004, the State filed a timely motion to clarify or modify that opinion. We grant the motion to modify, order the original opinion withdrawn from publication, and file this modified opinion.
Two issues are raised on appeal:
1. Did the district court err in fixing the amount of the State's potential recovery of damages? Our answer is, "Yes."
2. Did the district court err in dismissing the State's third-party beneficiary claims? Our answer is, "No."
We affirm in part, reverse in part, and remand for further proceedings.
The Underlying Circumstances and Proceedings
In 1989, under federal court order, the State undertook construction of a 1,000-bed maximum security prison in El Dorado, Kansas. The State employed a multi-bid prime contracting scheme under which several contractors contracted directly with the State for various phases of the project. The State employed Booker & Associates (Booker) as construction manager to coordinate the activities of the various prime contractors. The $50 million project was completed in 1992.
GMM constructed the prison's site utilities pursuant to a $6.5 million lump sum contract with the State. For contract billing purposes, GMM allocated approximately $1.097 million of its contract to the cost of the 3,900-foot long underground thermal piping system. The State has stipulated, for purposes of the summary judgment motions giving rise to this appeal, that the State's cost for the original underground thermal piping system was $1.097 million.
The underground thermal system pipes transport chilled water and steam at temperatures in excess of 300§F from the central plant to all the buildings in the facility. The contract required GMM to insulate the system for the underground pipes to meet performance criteria set out in the contract. Generally, the insulation system was to insulate the pipes to approximately 100§F where the system interfaces with the soil and to protect the pipe exteriors from corrosive moisture.
Different types of underground thermal piping systems for heating and cooling fall into several broad categories: (1) walk-through utility tunnels; (2) shallow concrete trenches; (3) direct-bury preinsulated piping; and (4) direct-bury piping with a poured-in-place insulation envelope. Walk-through tunnel systems cost the most initially but have the lowest lifetime costs due to ease of access, maintenance, and correction of maintenance errors. Shallow concrete trenches are usually the next most expensive system, followed by direct-bury preinsulated piping, and then direct-bury piping with poured-in-p